HomeCase StudiesFulham Reach

Fulham Reach, London

Fulham Reach, London

Project
Fulham Reach, F, G and H Block
Project type
Residential
Project location
London
Project size
368 Bathrooms and 1 penthouse
Client
Berkeley Homes
Heating system
Sticky Mat
Thermostat
Heating controlled via Tempo and 4iE
System specifications
  • StickyMat system
  • Wall heaters
  • Dual overlay
  • Insulated underlay
  • Tectora system

The Challenge

With tight tolerances available, Warmup had to redesign the level 6 heating system in conjunction with St. George to meet requirements. In addition, to design, supply and install electric floor heating to bathroom floors and walls up to level 5. Thereafter, design, supply and install hydronic systems to level 7 penthouse apartments over Danskin Beam and Batten floor.

The Solution

200W wall mat installed to enable use of non-heated towel rail in bathrooms. In the penthouse level 6, Tectora suspended system replaced the designed overboard system to meet available tolerances. StickyMat system and wall heating was used in all bathrooms throughout the block with Warmup Tectora system installed over Danskin floor on the level 7 penthouse.

The Result

Design accepted and signed off by St. George and incorporated in all future developments. Floor and wall heating installed throughout bathrooms in premier and platinum apartments.

Product information

Sticky Mat

Insulation Board

Wall heater

Tectora system

Technical Information

The ultra thin, 2mm multi strand, dual core heating cable, is double insulated with an advanced fluoropolymer making it exceptionally tough and easy to tile over.

With BEAB component approval, this KEMA and GS approved CE marked heating element meets the highest safety standards for ultimate peace of mind.

Related Projects

Catedral Santo Domingo – Spain

Catedral Santo Domingo – Spain

Beaufort Park – London

Beaufort Park – London

Kha Shing Enterprise Co. Ltd, Taiwan

Kha Shing Enterprise Co. Ltd, Taiwan

Have any questions about Warmup?